Note: 10 Photos in slideshow This layout is currently under construction. Phase #1 & #2 total man hours of labor 6,405.
Indoor M.T.H. Railroad
Railroad Track Plan:
Railroad Requirements:
Benchwork 32’x42’
MTH DCS Control
5 Train Loops
Control Cabinets
Electronic Wiring
Structure Lighting
Custom Turntable
PRR Prototype Signaling
Custom Lift Bridges
Custom Roundhouse
Custom PRR Catenary
Custom Backdrops
Custom Bridges
Custom Storage Cubes
Fascia work (Unfinished)
Scenery and Structures In Future
This client wanted a multi-level layout to entertain his clients, features five continuous loops with yard and custom made turntable, lift bridges, PRR catenary, prototype PRR signal system plus iPad and computer controlled!
Model Railroads
Look at other scales of model railroads, O,HO,N & Z.