8 Photos in slideshow Phase #1 & #2 total man hours of labor 762.
High Tech Lionel Railroad
Railroad Track Plan:
Railroad Requirements:
Layout Size 6’x9’
Lionel Legacy system
Lionel fasttrack
3 level operation
Classic and new Lionel accessories
Runs both classic and command control trains
Gold mine scene
Custom structures
Custom display cabinets
Open storage under layout
Push buttons to operate accessories
Realistic scenery with a mountain scene
This client wanted a very high tech operating layout for him to operate, with 3 train operation on 3 levels with both classic and command control trains. All running by his iPad or iPhone.
Model Railroads
Look at other scales of model railroads, O,HO,N & Z.